NEXCOM OPERATIONS // ONLINE
NexCommand AINEXCOM ERP
PLANNED

Engineering Document Control

Manage released technical baselines through a defined scope.

Revision, supersession, review, approval, distribution and released-baseline controls are proposed as a separately engineered EDMS capability.

NEXCOM // PLANNED/EDMS/ENGINEERING-DOCUMENT-CONTROL/

Operational scope

  • Revision and supersession rules
  • Review and change approval workflow
  • Released and obsolete status controls
  • Distribution acknowledgement and baseline evidence
Proposed scope—implementation and validation required
01FINANCE
02OPERATIONS
03PEOPLE
04STAKEHOLDERS
05EVIDENCE
CONNECTED CAPABILITY

How the workflow connects.

Capabilities are connected to common master data, permissions, workflows and evidence. Exact delivery is confirmed through the edition and implementation scope.

01

Revision and supersession rules

Revision, supersession, review, approval, distribution and released-baseline controls are proposed as a separately engineered EDMS capability.

02

Review and change approval workflow

Revision, supersession, review, approval, distribution and released-baseline controls are proposed as a separately engineered EDMS capability.

03

Released and obsolete status controls

Revision, supersession, review, approval, distribution and released-baseline controls are proposed as a separately engineered EDMS capability.

04

Distribution acknowledgement and baseline evidence

Revision, supersession, review, approval, distribution and released-baseline controls are proposed as a separately engineered EDMS capability.

CONTROLLED DELIVERY

Configuration is part of the product.

NexCom does not treat every listed workflow as automatically enabled. Edition selection, access rules, regional requirements, integrations and evidence obligations are defined and tested before production acceptance.

AVAILABLE

Supported by the current baseline.

CONFIGURABLE

Enabled through agreed project scope.

PLANNED

Proposed and subject to implementation.

NEXT STEP

Map NexCom to your operating model.

Bring your processes, stakeholder groups, deployment boundary and priority integrations.

Discuss requirements →